Royalty Plumbing, Gas & Electrical
Unit 2/385 Sevenoaks St, Beckenham WA 6107, Australia
Ezy-Plumb - Bayside Plumber Melbourne - Blocked Drain & Hot Water Specialist
9/214 Bay St, Brighton VIC 3186, Australia
Plumb-All
368 Glynburn Rd, Kensington Gardens SA 5068, Australia
JMACK Plumbing
14 Silverdale St, Bohle Plains QLD 4817, Australia
C J Hogan & Co Pty Ltd
1291 Chapman Place, Taree NSW 2430, Australia
Purely Filtration
28 Bedford St, Webberton WA 6530, Australia

Todd, a resident of Warabrook (2304), was facing a major issue with his stormwater system. The heavy rains had caused the pipes to become blocked, resulting in water overflowing and causing damage to his property. Desperate for a solution, he turned to Reactive Plumbing & Electrical after finding us through our ad.

Assigned Technician: Adam

We quickly assigned our experienced technician, Adam, to the job. With years of experience and expertise in handling similar issues, we knew he would be able to provide an effective solution for Todd’s problem.

The Job Description & Solution

Upon arrival at the site, Adam used CCTV cameras to inspect the stormwater line and found multiple defective sections of pipework. To restore flow and prevent any further damage, he first attempted using a jet blaster but unfortunately it did not work due to the severity of the blockage.

After careful consideration and consultation with Todd, Adam provided two options for spot digs – one emergency spot dig in dirt and another additional spot dig on another section of pipe that showed signs of potential failure.

Emergency Spot Dig:

  • – Excavate defective pipe in marked location.
  • – Expose around defective 90mm tee.
  • – Reinstate with new slope junction.
  • – Support pipework with appropriate fill.
  • – Backfill pipework.
  • – Leave site clean and tidy
      10 year warranty on pipework
      (This warranty covers any defects or issues with the pipework that may arise within 10 years of the spot dig.)

Additional Stormwater Spot Dig:

  • – Excavate defective pipe in marked location.
  • – Expose around defective 90mm tee.
  • – Reinstate with new slope junction.
  • – Support pipework with appropriate fill.
  • – Backfill pipework.